Project Category: Projects

  • September 12, 2024
  • By
  • (0) Comment

U.S. Geological Survey – Wetland and Aquatic Research Center (WARC)

7920 NW 71 St • Gainesville, FL 32653

Read More
  • September 12, 2024
  • By
  • (0) Comment

USDA Greenbrier Ranger Station Office Improvements

7409 Staunton Parkersburg Turnpike • Bartow, West Virginia 24920

Read More
  • September 12, 2024
  • By
  • (0) Comment

USDA – OTF Roof Replacement of the Toumey Fertilizer Garage

J W TOUMEY NURSERY USDA FOREST SVC, E23985 OLD US2 EAST • WATERSMEET , MI 49969

Read More
  • September 12, 2024
  • By
  • (0) Comment

USDA GMF Ripton Barracks Int Demo

13 Silver Towers Rd • Ripton, Vermont 05766

Read More
  • September 12, 2024
  • By
  • (0) Comment

USDA St. Ignace Admin Site Seal Coating

w1900 US-2 • St Ignace, Michigan 49781

Read More
  • September 12, 2024
  • By
  • (0) Comment

USDA Deer River RD Sidewalk & Gutter Repair

200 Ash Ave NW • Cass Lake, Minnesota 56633

Read More
  • September 12, 2024
  • By
  • (0) Comment

NPS – Saxton House Rehabilitation

331 Market Ave S • Canton, OH 44702

Read More
  • September 12, 2024
  • By
  • (0) Comment

USDA Potosi Ranger District Office Roof Replacement

10019 State Highway 8 West • Potosi, Missouri 63664

Read More
  • April 3, 2022
  • By
  • (0) Comment

San Simon Elementary School Painting and Repair – AZ

Our team has provided skilled trade personnel to paint all the 10 school and maintenance buildings according to the specified color combinations. Our team has inspected all buildings for wall deficits, cracks, damaged stucco areas, and paint layers, and then painted all the school buildings and maintenance buildings.

Read More
  • April 3, 2022
  • By
  • (0) Comment

Boundary Maintenance – NC

Our team is currently maintaining the USACE agency’s property boundary at B. Everett Jordan Lake by brushing, painting, installing tree signs and carsonite posts while removing underbrush along the project’s boundary by utilizing the boundary segment maps.

Read More